PSS PS600 Betreibershandbuch Seite 30

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 47
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 29
Starting up and testing the machine
This procedure describes how to start up and test the machine to make sure it is ready to
fold and seal your forms. Always perform this procedure at the start of each form
processing session to ensure the best results.
Before you start up and test the machine, make sure all of the following conditions are
satisfied:
The folding plates are adjusted and installed properly for the fold you want.
The form guides are set correctly to provide enough, but not too much, clearance at
the sides of the form stack
Forms are properly loaded and the Ready message is shown on the LCD display.
PS 600 4. Operation
22-01-03 Iss. B. Page 27
Seitenansicht 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 46 47

Kommentare zu diesen Handbüchern

Keine Kommentare